HOME
PORTFOLIO
ABOUT THE COMPANY
COMPANY REGISTRATION
PROJECTS
Replacement of ash handling system in TPP Kostolac A
Design of engineering structures on access road to IKEA store
CCGT CHP Pančevo in Oil Refinery Pančevo
Pre-feasibility study with general project CCGT CHP Pančevo on area HIP Petrohemija
Flue gas desulphurization in power plant Kostolac B
As-built design for access road constructions to the Ada bridge
Delivery of the vehicles to the Ministry of Agriculture and Environmental Protection of Serbia
Delivery of vehicles for the Croatian Employment Service
Technical control of the overpass over the railway line on the loop Batajnica
The main project of increased maintenance of the state road IB 25
CERTIFICATES
LICENSES
NEWS
WORK WITH US
CONTACT
office@duobacco.rs
011/4087-113
Duo Bacco
Duo Bacco
HOME
PORTFOLIO
ABOUT THE COMPANY
COMPANY REGISTRATION
PROJECTS
Replacement of ash handling system in TPP Kostolac A
Design of engineering structures on access road to IKEA store
CCGT CHP Pančevo in Oil Refinery Pančevo
Pre-feasibility study with general project CCGT CHP Pančevo on area HIP Petrohemija
Flue gas desulphurization in power plant Kostolac B
As-built design for access road constructions to the Ada bridge
Delivery of the vehicles to the Ministry of Agriculture and Environmental Protection of Serbia
Delivery of vehicles for the Croatian Employment Service
Technical control of the overpass over the railway line on the loop Batajnica
The main project of increased maintenance of the state road IB 25
CERTIFICATES
LICENSES
NEWS
WORK WITH US
CONTACT
Other
Other
October 4, 2018 - 10:57 am
0 Comments
By
Duo Bacco
Recent Posts
Changes in the ownership structure of the Duo Bacco doo company