As-built design for access road constructions to the Ada bridge
Project Overview
The company Duo Bacco has successfully completed development of the project for the first A (1a) and the first B (1b) phase of as-built design for the construction of access roads to the Ada Bridge, on the Makis side.
Phase 1a of the project included the creation of as-built building on the structures of the UMP, the Hippodrome loop (11 facilities), while Phase 1b related to the development of as-built design on UMP constructions, the loop Hippodrome (4 facilities).