• HOME
  • PORTFOLIO
    • ABOUT THE COMPANY
    • COMPANY REGISTRATION
    • PROJECTS
      • Replacement of ash handling system in TPP Kostolac A
      • Design of engineering structures on access road to IKEA store
      • CCGT CHP Pančevo in Oil Refinery Pančevo
      • Pre-feasibility study with general project CCGT CHP Pančevo on area HIP Petrohemija
      • Flue gas desulphurization in power plant Kostolac B
      • As-built design for access road constructions to the Ada bridge
      • Delivery of the vehicles to the Ministry of Agriculture and Environmental Protection of Serbia
      • Delivery of vehicles for the Croatian Employment Service
      • Technical control of the overpass over the railway line on the loop Batajnica
      • The main project of increased maintenance of the state road IB 25
    • CERTIFICATES
    • LICENSES
  • NEWS
  • WORK WITH US
  • CONTACT
  • Српски језик
office@duobacco.rs 011/4087-113
  • Duo BaccoDuo Bacco Duo BaccoDuo Bacco
    • HOME
    • PORTFOLIO
      • ABOUT THE COMPANY
      • COMPANY REGISTRATION
      • PROJECTS
        • Replacement of ash handling system in TPP Kostolac A
        • Design of engineering structures on access road to IKEA store
        • CCGT CHP Pančevo in Oil Refinery Pančevo
        • Pre-feasibility study with general project CCGT CHP Pančevo on area HIP Petrohemija
        • Flue gas desulphurization in power plant Kostolac B
        • As-built design for access road constructions to the Ada bridge
        • Delivery of the vehicles to the Ministry of Agriculture and Environmental Protection of Serbia
        • Delivery of vehicles for the Croatian Employment Service
        • Technical control of the overpass over the railway line on the loop Batajnica
        • The main project of increased maintenance of the state road IB 25
      • CERTIFICATES
      • LICENSES
    • NEWS
    • WORK WITH US
    • CONTACT
    • Српски језик

    Energy

    • Show all
    • Energy
    • Infrastructure
  • Replacement of ash handling system in TPP Kostolac A

    Energy

    For the needs of company Clyde Bergemann, our engineers completed the main project of replacement of ash handling system in thermal power plant Kostolac A. After its establishment, Duo Bacco continued

  • CCGT CHP Pančevo in Oil Refinery Pančevo

    Energy

    After the decision of companies ENPI from Slovakia and NIS (Petroleum Industry of Serbia) to locate CCGT CHP Pančevo in front of the Oil Refinery Pančevo, the representatives of the

  • Sva prava zadržana | Studio triD
    • ABOUT THE COMPANY
    • WORK WITH US
    • PROJECTS
    • CERTIFICATES
    • LICENSES
    • CONTACT